Premier Water Solutions white logo on transparent background
transparent design image

PWS Wastewater Compliance FrameworkTM

Independent Verification of Wastewater System Performance

The Environment Agency is introducing new standard rules permits for small sewage discharges. While these simplify permitting, they do not verify how systems perform in real-world conditions. The PWS Wastewater Compliance FrameworkTM provides independent assessment and certification of wastewater systems to demonstrate operational compliance.
Premier Water Solution Installing a Wastewater Treatment System

New Standard Rules Permits — What You Need to Know

Standard rules permits will replace many bespoke permits
Typical ammonia limits around 10 mg/l
No routine sampling requirement
Compliance based on conditions — not ongoing verification
A permit allows discharge
It does not confirm that the system is performing correctly

The Missing Link in Wastewater Compliance

Most systems are:
permitted
installed
but not independently verified in operation
This creates risk for:
property owners
developers
buyers and solicitors
environmentally sensitive catchments

PWS Wastewater Compliance FrameworkTM

A structured methodology for assessing:
System type and discharge route
Compliance with the Environment Agency General Binding Rules
Evidence of pollution
Maintenance and operability
Real-world system performance

PWS Wastewater Discharge Compliance CertificateTM

Issued following inspection, the certificate provides:
Independent compliance assessment
Clear classification (Compliant / Legacy / Non-Compliant)
Evidence for property transactions
Support for planning and development
Documented inspection record

Understanding Legacy Systems

Older systems such as:
cess pits
septic tanks with hit-and-miss soakaways
may not meet modern design standards, but:
Where no pollution is observed, they may continue to operate under current regulatory principles.
This requires professional interpretation, not blanket replacement.

Who This Is For

Property buyers and sellers
Solicitors and surveyors
Developers and planners
Asset managers
Rural property owners
Light blue and transparent design image

Permit vs Compliance

Standard Rules Permit

PWS Compliance Framework

Regulatory approval
Performance verification
Annual inspection
Evidence for solicitors
Real-world assessment

Book a Wastewater Compliance Assessment

Ensure your system is not just permitted — but performing as intended.
Book Your Inspection

Incorrectly Installed Plants

Incorrectly installed plant
Incorrectly installed plant
These are some of the installations that we have encountered that can leave you with a considerable repair fee. In this case, the percolation tests were not carried out correctly and the treatment plant was installed way too deep. As a result of the soakaway failing, the water backed up and caused the blower to malfunction, rendering the plant to fail.

With every PWS installation, the work is certified with a Building Regulation Completion Certificate and our own PWS Wastewater Discharge Compliance Certificate.

This ensures that the percolation tests are carried out correctly and the system designed and installed to the optimum operational requirements. We carry out annual maintenance to check the compliance against the General Binding Rules and the EA Permit, and re-issue the Compliance Certificate to give complete piece of mind.

PWS Wastewater Compliance FrameworkTM and PWS Wastewater Discharge Compliance CertificateTM are proprietary systems developed by Premier Water Solutions 10 Ltd.

menucheckmark-circlecross-circlechevron-right-circle