Premier Water Solutions, a consultancy and service provider in Cornwall, faced multiple operational challenges before implementing Re-flow. Their paper-based systems led to inefficiencies: team members spent excessive time on manual documentation and reporting, while communication breakdowns caused delays.
Premier Water Solutions 10 Ltd was contracted to review a proposal to erect a 4MW solar farm consisting of solar panels, power invertor stations, transformer stations, sub-station, security fencing with associated access gates and CCTV security cameras at land to the west of Potbridge Farm, Hook, RG29 1JN.
Premier Water Solutions 10 Ltd was appointed by Heligan House Ltd to undertake a full turnkey foul water solution for the main house and the small village.
Premier Water Solutions 10 Ltd was appointed by Lappa Valley Railways Ltd to undertake a full turnkey foul and surface water solution for their brand new indoor play and café shed.
There was an antiquated septic tank that served the school that had started to malfunction and as a result Premier Water Solutions 10 Ltd was commissioned to design and install a new treatment process for the main school building.
Premier Water Solutions 10 Ltd were asked though their membership with the Cornwall Community Flood Forum whether we would consider providing specialist advice and training to Cornwall Council via their bid application to obtain grant funding for a new pathfinder project.
A change in the Environment Agency regulations, meant that the existing drainage system was no longer compliant to discharge. Swallowcourt Ltd appointed Premier Water Solutions 10 Ltd to provide a full turnkey solution and to guide them through the minefield of environmental and planning regulations.
Premier Water Solutions 10 Ltd was appointed as the principal contractor and designer under Construction Design and Management regulations to obtain building regulations to provide a foul and surface water drainage solution which would be acceptable to the statutory authorities.